BIM Coordination Case Studies.
Real engineering challenges, proven VDC solutions, and measurable outcomes — across commercial, healthcare, and infrastructure projects.

Cyber City Commercial Tower
Congested MEP shafts across 45 floors with 3,200+ hard clashes detected in design-intent model coordination audit.
Multi-disciplinary Navisworks Manage clash matrix testing with weekly BCF issue resolution cycles and 4D construction crane phasing.

Vanguard Memorial Hospital
Medical gas piping, negative-pressure isolation HVAC, and radiation shielding routed through narrow ceiling plenums.
Specialised healthcare BIM coordination with clearance matrices for pneumatic tube systems, AHU vibration isolation, and OT equipment integration.

Underground Metro Station Coordination
Underground station cavern geometry and tunnel MEP ventilation coordination across 14 structural and service disciplines.
Civil 3D alignment integration, 4D Synchro multi-phase tracklaying sequencing, and federated IFC 4.3 model export.