CLIENT SUCCESS STORIES

BIM Coordination Case Studies.

Real engineering challenges, proven VDC solutions, and measurable outcomes — across commercial, healthcare, and infrastructure projects.

Cyber City Commercial Tower
LOD 400
Commercial High-Rise

Cyber City Commercial Tower

Challenge:

Congested MEP shafts across 45 floors with 3,200+ hard clashes detected in design-intent model coordination audit.

VDC Solution:

Multi-disciplinary Navisworks Manage clash matrix testing with weekly BCF issue resolution cycles and 4D construction crane phasing.

Measurable Outcomes:
3,284
Clashes Resolved
22%
MEP Cost Reduction
6 Wks
Schedule Compression
Vanguard Memorial Hospital
LOD 400 / ISO 19650
Healthcare

Vanguard Memorial Hospital

Challenge:

Medical gas piping, negative-pressure isolation HVAC, and radiation shielding routed through narrow ceiling plenums.

VDC Solution:

Specialised healthcare BIM coordination with clearance matrices for pneumatic tube systems, AHU vibration isolation, and OT equipment integration.

Measurable Outcomes:
1,940+
Clashes Resolved
100%
Code Compliance
4 Wks
Earlier Handover
Underground Metro Station Coordination
LOD 350
Infrastructure

Underground Metro Station Coordination

Challenge:

Underground station cavern geometry and tunnel MEP ventilation coordination across 14 structural and service disciplines.

VDC Solution:

Civil 3D alignment integration, 4D Synchro multi-phase tracklaying sequencing, and federated IFC 4.3 model export.

Measurable Outcomes:
2,100+
Spatial Conflicts Resolved
18%
Rework Cost Avoided
12 Wks
Coordination Duration