ENGINEERING METHODOLOGY

ISO 19650 Structured VDC Execution Process.

Our standardized 6-stage lifecycle guarantees zero site rework, compressed construction timelines, and seamless digital twin asset handover.

ISO 19650 LIFECYCLE WORKFLOW

End-to-End VDC Execution Process

Click any phase below to inspect scope deliverables
LOD 200 / EXISTING ASSETS

01. Laser Scan & Point Cloud Capture

High-density 3D LiDAR point cloud capture with sub-millimeter geospatial accuracy.

Technical Execution Scope:
  • Terrestrial & aerial drone LiDAR scanner data registration
  • Georeferenced E57 point cloud processing & noise filtering
  • Existing structure & MEP heritage scan auditing
Standard Deliverable Pack:

E57 / RCP Georeferenced Point Cloud Pack

ISO 19650 Protocol Verification:

Audited according to Common Data Environment (CDE) container naming standards.

STEP-BY-STEP EXECUTION LIFECYCLE

How We Deliver Zero-Clash VDC Projects

01

Discovery & BEP Authoring

Establishing Common Data Environment (CDE) protocols, naming containers, LOD targets, parameters, and BIM Execution Plan (BEP) aligned with ISO 19650-1/2.

Standard Deliverable:

ISO 19650 BEP & CDE Naming Protocol Matrix

02

Parametric LOD 300 Modeling

Authoring high-precision architectural, structural, and MEP baseline models from 2D CAD drawings or laser scan point cloud data.

Standard Deliverable:

Multidisciplinary Native Revit (.RVT) & IFC 4.3 Models

03

MEPF High-Density Coordination

Running automated Navisworks Manage hard and soft clearance clash matrices across mechanical HVAC, electrical, plumbing, and structural frames.

Standard Deliverable:

Zero-Clash Navisworks Master (.NWD) & BCF Issue Reports

04

Shop Drawings & Spool Generation

Extracting 2D fabrication shop drawings, sleeve location plans, beam penetration cutouts, and precast concrete rebar bending schedules (BBS).

Standard Deliverable:

2D Approved Shop Drawings & Spool Cut Sheet Packs

05

4D Scheduling & 5D QTO Cost Linking

Linking Primavera P6 / MS Project timelines to 3D elements for Synchro 4D construction sequencing and automated 5D Quantity Takeoff (QTO).

Standard Deliverable:

4D Synchro Sequence Animation MP4 & 5D Cost Schedule

06

LOD 500 COBie As-Built Handover

Integrating site-verified redline updates and COBie 2.4 equipment asset metadata for facility management in Autodesk Tandem.

Standard Deliverable:

COBie 2.4 Excel Sheet & LOD 500 Facility Digital Twin

TRUST & QUALITY ASSURANCE

Why Leading AEC Teams Partner With BIMVEDH

We bridge the gap between design vision and site execution with rigorous ISO-compliant workflows, engineering precision, and transparent digital collaboration.

STRICT COMPLIANCE

Engineering-First Methodology

Led by structural architects and licensed civil engineers—not just software drafters. Every model parameter is validated for physical constructability.

IFC 4.3 & BCF

OpenBIM & IFC Interoperability

Full buildingSMART IFC 4.3 & BCF support ensuring zero data lock-in across Revit, Navisworks, Solibri, and Tekla software platforms.

ISO 19650-1/2

ISO 19650 Quality Framework

Standardized Common Data Environment (CDE) naming conventions, information container exchange protocols, and QA/QC check matrices.

ZERO SITE REWORK

Multidisciplinary QA Audit

Rigorous 3-stage internal clash detection process prior to client submission: Hard Clashes, Clearance Tolerances, and Maintenance Access.

24-HR RFI SLA

24/7 Responsive Technical Support

Dedicated project lead assigned to every account with guaranteed 24-hour turnaround for RFI clarifications and model updates.

COMPUTATIONAL VDC

Modern VDC Automation Engine

Proprietary Dynamo automation scripts, Revit API routines, and 4D/5D computational integration for rapid model production.

Ready to Eliminate Rework & Model the Future?

Partner with BIMVEDH for ISO 19650-certified VDC solutions and zero-clash BIM execution.