SERVICE SPECIFICATION • LOD 300 - LOD 400
4D Construction Simulation & 5D Cost Estimating ISO 19650 Deliverable.
Link 3D BIM models with project timelines (Primavera/MS Project) and budget databases for visual VDC management.
Back to Full Services Directory
TECHNICAL OVERVIEW
Engineering Scope & Execution Strategy
4D scheduling links model elements to time schedules to visualize construction sequencing and spot site logistical choke points. 5D BIM integrates cost databases to generate automated, dynamic cash-flow forecasting and real-time budget tracking.
Technical Execution Capabilities
Time-Lapse Site Logistic & Crane Reach Simulations
Planned vs. Actual Timeline Variance Videos
Automated 5D Cost Model Linking & QTO
Subcontractor Work Breakdown Structure (WBS) Tagging
ISO 19650 CONTAINER FORMATS
Standard Deliverables Pack
Quantified Business Impact & ROI
Interactive Site Logistics Planning
Transparent Progress Reporting to Stakeholders
Accurate Monthly Progress Payment Claims
Software Stack & Platform Engine: